What are the main parts of construction?

For each level of construction, from the simplest to the most complex, certain methods and procedures must be followed to ensure that it will be successful. These services may vary depending on their size, the number of people involved, the budget and the delivery date. However, construction work is often a long and demanding process. The good news is that with the advancement of digital solutions, managing the different phases of the project can be done more efficiently and concisely. In addition, collecting useful field data can play an important role in improving and, indeed, planning the legal framework of future projects. In summary, here are 6 types of construction projects and what you need to know about them: 

1. Project planning

Normally, the process starts with the customer. This is where the dream begins and the search for the right place and definition/pattern to meet.

Depending on the project, the organizational structure may be different. This can take anywhere from a few days to a few months, or longer, depending on how urgent it is to complete the project.

It is needless to say that the home team does not have much influence at this time, because the ball is still in the hands of the owner.

2. Design

Once the project is nearing completion, it’s time to sit down and talk about design. This is still an early stage, which means nothing is certain at this time. However, design is the stage where the application process usually begins. The design team, led by an architect or engineer, will ensure compliance with all state codes and regulations and respect the owner’s vision and ensure that newly constructed structures will be used.

There are usually four different stages during the design process and they include activities and capabilities, planning, design development and contract documentation. During the planning and feasibility stage, the goals and objectives of each must be defined. Many decisions are made at this time, including the size of construction, how the space will be used, and the number of rooms needed. 

A design is a drawing that will show space as well as objects, colors and even textures. This diagram will be used during design development to evaluate the required equipment, as well as its cost and materials. Once the contract is drawn up, everything is close to completion, since they have final drawings and specifications. These books are used in the construction field by those who want to work in the profession. 

3. Pre-Operation Procedures

The next phase of construction work begins after the benchmarks are completed and a contractor is selected to do the work. Once a contractor is selected, the project team is formed.

Normally, the construction team is given help to prepare the construction site before the work starts. As a rule, it includes the following experts: 

  • Contract Administrator 
  • Project Manager 
  • Supervisor 
  • Site Engineering 
  • Health and Safety Manager 

Working closely with the contractor, the project team is responsible for field visits to complete site inspections. The site survey will help the project team identify or predict environmental challenges that may arise during the construction process. Soil analysis is also an important part of this step. Once all the information is collected, local authorities must review all plans and conclusions. This is often a lengthy process, as all concerns and opinions must be heard and taken into account. 

4. Marketing strategy

Now is the time for the project team to order and get supplies, equipment, and services. This process of the project can be complex or complex depending on the size of the project, the resources available and the agreed start date.

Most large construction companies have a purchasing department. In such cases, it is common for construction companies to order workers, tools, and materials for multiple projects at the same time. This process can be different in small projects. All of this work is usually done by a general contractor; however, it sometimes happens that subcontractors are responsible for certain aspects. Underground workers may be responsible for hiring their own workers or getting their own materials so they know they have exactly what they need to complete a part of the job. 

5. Construction method

Before construction begins, a pre-construction meeting is held to ensure that everyone is on the same page when construction begins. This forum usually includes information on the following topics: 

  • how to access the site 
  • project quality control 
  • how and where everything will be stored 
  • hours each person will work 

Each user can be assigned his own schedule. It is also important to note that each employee’s schedule may vary depending on their role. This is especially true for underground workers who have to complete some part of the project before starting their part. It is clear that poor planning at this stage can Pull to significant delays in budget. Once the meeting is over and there are no more outstanding questions, the first part of the project can begin. The goal at this point is to plan everything carefully so that everything goes smoothly. Of course, this rarely happens, because things always go wrong during construction.

To avoid pitfalls, when planning your construction project, you need to use digital solutions.

6. The post-construction stage

Last but not least, the post-construction stage. Now that all the work on the site has been completed, the project will come to a close.

However, there are still a few steps to complete before handing over the keys to the house. Generally, the final stage of the construction work is divided into three main stages: 

A. Construction of new buildings

First, an inspection of the entire building will be conducted. If everything is done correctly, these tests are easy to pass.

The reason is that more research must be done throughout the project. It is during these past inspections that the problems will be identified and resolved.

Once everything has been checked, it is time for the project team to train the client on the operation and maintenance of the newly constructed structure. This is a very important step because it will help increase the life of the project. 

B. The owner’s mouth

Now that the training is over, the owner can take over the house. This is when the right period begins. In this way, the owner of the project can be sure that he will have enough time to evaluate the system, tools, and various things installed. There are three main types of guarantees in construction: 

  • Express promise: It is usually included in the contract.
  • License Meaning: Required by law. 
  • Legal compliance: Incorporated into the laws of the state.

C. Closing

This is the final step in a long process of planning and construction work. The project team must conclude a contractual agreement and ensure that the project is free from any type of legal burden. At this time, it is also a good practice to conduct a post-project analysis that can help various users to identify unfinished projects, analyze why this happened and make a list of ideas for the future.

Post-job reviews can also be the basis for creating an in-depth job completion report. 

The final word

Finally, each stage of construction work is a process, decision and many tools. Its complexity depends on the size and type of work, but there are always some important steps that cannot be ignored. Unparalleled dialogue between different parties and fact-based decisions are two important pillars for planning the construction work and ensuring that all the processes will be designed and completed within the time and budget. approved.